Latest posts
-

Choosing Between Battery Families on One Site
A property rarely has one kind of door. There is the main entrance, the back-of-house door, the office suite, the service gate,…
-

The First Thirty Days After Installation
Installation day feels like the end of the project. The lock is on the door, the credential has been issued, the installer…
-

Service Entrances in Mixed-Use Buildings
In a mixed-use building, the front doors are easy to describe. Retail has its shopfront, offices have a lobby, and residents have…
-

What a Distributor Should Ask Before Adding a Lock Range
The first order is a transaction. The second order is the business. A distributor that adds a lock range is not buying…
-

The Complaint That Wasn’t About the Lock
When an entry fails, the phone call usually names the lock. It is the newest piece of equipment on the door, the…
-

When Two People Share One Door
A shared entrance between two households is a common arrangement with an uncommon problem at the front door. An elderly parent moves…
-

Reading a Lock Specification Sheet
A lock specification sheet looks like a page of engineering notes. In practice it is a contract in disguise: every number on…
-

Handing Over a Renovated Entrance: The Punch List
The renovation is ninety-eight percent done. The walls are painted, the floor is down, and the front door still does not close…
-

The Spare Parts Question: What to Hold and What to Order
Every installation eventually needs a component. The first time a part fails, it is a surprise: a latch that stops springing, a…
